Construction of a pushed pipeline from well T-6 to a factory for the production of mineral water and other non-alcoholic beverages in Kozluk

Construction of a pushed pipeline from well T-6 to a factory for the production of mineral water and other non-alcoholic beverages in Kozluk

Time of work: 09.2014. - 10.2014.

Investor: "Vitinka eksploatacija" doo Kozluk

Show map

Copyrights © Buk Promet 2025. All rights reserved.